The Rosebery Group completed a shutdown on PM3 to upgrade 45No. machine drives & the associated machine safety system. The installation included the identification and removal / re-connection of over 300 cables and the installation of a further 100 cables. The installation was completed within the 7 days deadline and the Paper Machine was back fully operational within the scheduled timescales.

Project Information

  • Identification, isolation & disconnection of all existing cabling
  • Removal of Existing Drive Suites
  • Installation of New ABB Drive Suites
  • Re-connection of all Panel Incoming & Motor Cabling
  • Re-cabling of Field Emergency Stop Pushbuttons & Pilz Safety System
  • Re-cabling of Motor Encoder Cabling
  • Earthing & Bonding.
  • Testing & Inspection
  • Shutdown works completed on time and within budget
  • No lost time accidents
  • Client: DS Smith paper UK
  • Site: Kemsley mill, Kent, UK
  • Project: PM3 Drive Upgrade
  • Project Value: ££